Applications:
• The contact lines of the 25 kV, 50 Hz electrified railway with the normal duration of operation: 24 – 36 years
EXECUTED WORKS:
• LC and PICV works on the Coslariu-Vintu de Jos section, Coslariu Simeria section, part of the IV Pan European Corridor
• Electrification of a section of railway at Craiova Wagon Overhaul
• Construction of the tram contact line at the Overpass over the km 0 intersection of Craiova municipality
![IMG-20231018-WA0000](https://spiact.ro/wp-content/uploads/2023/10/IMG-20231018-WA0000-1.jpg)